You can monitor the status of a recovery plan and determine the operation that is allowed in each state. The state of a recovery plan is determined by the states of the protection groups within the plan.

Table 1. Recovery States

State

Description

Ready

Recovery steps are cleared.

Test in progress

Canceling a test moves plan to Cancel In Progress state.

Test complete

Test completed with or without errors.

Test interrupted

Server failed while a test was running.

Cleanup in progress

After successful cleanup, plan state goes to Ready.

If cleanup is incomplete, state goes to Cleanup Incomplete.

If you set the Force Cleanup option, state goes to Ready after an error.

If a failure occurs during cleanup, state goes to Cleanup Incomplete.

Cleanup incomplete

Errors occurred during cleanup.

You can run the cleanup again.

When running cleanup from this state, the cleanup wizard provides an option to ignore errors.

Cleanup interrupted

Site Recovery Manager failed during cleanup.

You cannot change recovery options.

Recovery in progress

If you cancel recovery, the state goes to Cancel in progress.

Disaster recovery complete

During recovery at the protected site, VM shutdown enountered errors, possibly because the sites were not connected, the step before split brain.

System prompt warns of split brain and to run recovery again when sites reconnect.

When sites are connected, state goes to Recovery Required (split brain)

Recovery started

A recovery started on the peer site, but if the sites are not connected, the exact state is unknown.

Log in to the recovery site or reconnect the sites to get the current state.

Recovery required (split brain)

Sites were disconnected during recovery. Split brain scenario detected when sites reconnect.

System prompts you to run recovery again to synchronize the sites.

Recovery complete

VMs are all recovered but with errors. Running recovery again does not fix the errors.

Plan goes to this state after the split brain recovery is resolved.

You can see the recover steps of the last recovery run.

Incomplete recovery

Canceled recovery or datastore error. Run recovery again.

You need to either resolve errors and rerun recovery, or remove protection for VMs in error. The plan detects the resolution of errors in either of these ways and updates state to Recovery Complete.

Partial recovery

Some but not all protection groups are recovered by an overlapping plan.

Recovery interrupted

A failure during recovery causes the recovery to pause. Click Recovery to continue. You cannot change recovery options.

Cancel in progress

Canceling a test results in Test Complete with last result canceled.

Canceling a recovery results in Incomplete Recovery with last result canceled.

Reprotect in progress

If the server fails during this state, it goes to Reprotect Interrupted .

Partial reprotect

Overlapping plan was reprotected.

The already reprotected groups go to Ready state, but this is valid, since the other groups are in the Recovered state.

Incomplete reprotect

Reprotect did not complete the storage operations. Sites must be connected for the reportect to succeed on the new run.

Reprotect interrupted

If the Site Recovery Manager Server fails during reprotect, run reprotect again to continue and properly clean up the state.

Waiting for user input during test

Test is paused. Dismiss the prompt to resume the test.

Waiting for user input during recovery

Recovery is paused. Dismiss the prompt to resume recovery.

Protection groups in use

Plan contains groups that are being used for a test by another plan. This state also occurs when the other plan has completed a Test operation on the groups, but has not run Cleanup.

Wait for the other plan to complete the test or cleanup or edit the plan to remove the groups.

Direction error

Groups are in a mixed state, which is an invalid state. Some groups are Ready in both directions: a site is protected and a site is recovered within a particular group. Remove some protection groups.

For this error to occur, overlapping plans have run and reprotected all the groups in the plan already.

Plan out of sync

This state can occur under different circumstances:

  • Between a successful test recovery and a cleanup operation. You cannot edit the plan when it is in this state. Run cleanup to return the plan to the Ready state. If the plan remains in the Plan Out of Sync state, edit the plan.

  • During regular operation You can edit the plan.

Opening the plan for editing causes Site Recovery Manager to force synchronization of Site Recovery Manager internal data about the plan between protection and recovery Site Recovery Manager servers, which clears the Plan Out Of Sync status .

No protection groups

The plan contains no protection groups and the plan cannot run.

You can create empty plans through the API or by deleting protection groups.

Internal error

A protection group with an unknown state is in the plan, or some other unexpected error occurred.

You cannot run the plan but you can delete it.