This section shows the steps for upgrading Controller size for a Controller cluster.
The steps are as follows:
Take backup of the configuration.
Dismantle the cluster.
Remove both the followers (see 'Dismantling the Controller Cluster' section in this topic)
Resize the controller nodes.
Re-create the cluster, from the same leader