After powering down the primary rack, you power down all of the switches in a prescribed sequence.

About this task

Procedure

  1. Power down the ToR switches in each rack.
  2. Power down the spine switches in the second rack.

    Only the second rack in a Cloud Foundation installation has the two spine switches.

  3. Power down the management switches in each rack.