Rack 2 in the integrated system powered by Cloud Foundation must include two inter-rack switches for inter-rack connectivity. The inter-rack switches are connected during the physical environment inspection, but must be disconnected before imaging the rack.

Additional physical racks do not contain inter-rack switches. ToR switches in the additional physical racks are connected to the two inter-rack switches in rack 2.