This section shows the steps for upgrading Controller size for a Controller cluster.

The steps are as follows:

  1. Take backup of the configuration.

  2. Dismantle the cluster.

    1. Remove both the followers (see 'Dismantling the Controller Cluster' section in this topic)

  3. Resize the controller nodes.

  4. Re-create the cluster, from the same leader