The failover solution supports the following BIM failover scenarios:
-
Scenario 1: Active BIM is down on page 27
-
Scenario 2: Both Active BIM and Active SAM are down on page 27
The failover solution supports the following BIM failover scenarios:
Scenario 1: Active BIM is down on page 27
Scenario 2: Both Active BIM and Active SAM are down on page 27