The life cycle stages of an application container for your VMware Tanzu Application Service for VMs (TAS for VMs) deployments running on the Diego architecture include deployment, failure events, evacuation, and shutdown.

Deployment

App deployment involves uploading, staging, and starting the app in a container. Your app must complete each of these phases within a certain time limit. The default time limits for the phases are:

  • Upload: 15 minutes
  • Stage: 15 minutes
  • Start: 60 seconds

Your administrator can change these default settings. Check with your administrator for the actual time limits set for app deployment.

Developers can change the time limit for starting apps through an app manifest or on the command line. For more information, see Deploying with app manifests and Using app health checks.

Crash events

If an app instance fails, TAS for VMs restarts it by rescheduling the instance on another container three times. After three failed restarts, TAS for VMs waits 30 seconds before attempting another restart. The wait time doubles each restart until the ninth restart, and remains at that duration until the 200th restart. After the 200th restart, TAS for VMs stops trying to restart the app instance.

Evacuation

Some actions require restarting VMs with containers hosting app instances. For example, you can update stemcells or install a new version of TAS for VMs. You must restart all the VMs in a deployment.

TAS for VMs relocates the instances on VMs that are shutting down through a process called evacuation. TAS for VMs recreates the app instances on another VM, waits until they are healthy, and then shuts down the old instances. During an evacuation, you might see the app instances in a duplicated state for a brief time.

During app duplication, singleton app instances might become temporarily unavailable if the replacement instance does not become healthy within the evacuation timeout of the Diego Cell (the default is ten minutes). App developers with a low tolerance for downtime might prefer to run several instances of their app. See Run multiple instances to increase availability.

Shutdown

TAS for VMs requests a shutdown of your app instance when:

  • A user runs cf scale, cf stop, cf push, cf delete, or cf restart-app-instance.

  • A system event occurs, such as the replacement procedure during Diego Cell evacuation or when an app instance stops because of a failed health check probe.

To stop the app, TAS for VMs sends the app process in the container a SIGTERM. By default, the process has ten seconds to shut down gracefully. If the process has not exited after ten seconds, TAS for VMs sends a SIGKILL.

By default, apps must finish their in-flight jobs within ten seconds of receiving the SIGTERM before TAS for VMs stops the app with a SIGKILL. For example, a web app must finish processing existing requests and stop accepting new requests. To change the timeout period on the TAS for VMs tile or IST tile, go to the Advanced Settings tab and edit the “app graceful shutdown period” property. This might increase the time it takes to drain Diego Cells, which causes increased deployment time.

If your apps require a longer period of time to finish in-flight jobs and gracefully shut down, you can increase the graceful shutdown period. For more information, see Configure Advanced Features in Configuring TAS for VMs.

Note An exception to the cases previously mentioned is when monit restarts a Diego Cell replacement or Garden server that has failed. In this case, TAS for VMs immediately stops the apps that are still running using SIGKILL.