Implement the physical network based on the leaf-and-spine network architecture. Each Layer 2 network is terminated at a leaf. Prepare the Physical SwitchesBefore you deploy the Telco Cloud Infrastructure Cloud Director Edition components, you must cable the physical switches. You must also enable VLAN trunking and jumbo frames for all switch ports. Configure the Physical SwitchesTo enable connectivity and network isolation to the virtual infrastructure, configure the physical switches for the Management, Edge, and Resource Pods. Parent topic: Physical Infrastructure Readiness