After you change the certificate of a vCenter Server instance for Consolidated SDDC, update the certificates on the connected vRealize Operations Manager node by reconnecting the vCenter Adapter and vSAN Adapter instances.

Procedure

  1. Log in to vRealize Operations Manager by using the operations interface.
    1. Open a Web browser and go to https://vrops01svr01.rainpole.local.
    2. Log in using the following credentials.

      Setting

      Value

      User name

      admin

      Password

      vrops_admin_password

  2. On the main navigation bar, click Administration.
  3. In the left pane of vRealize Operations Manager, under Management, click Certificates.
  4. Select the row that contains CN=sfo01w01vc01.sfo01.rainpole.local and click the Delete icon.
  5. In the left pane of vRealize Operations Manager, click Solutions.
  6. Reconnect each vCenter Adapter.
    1. Select the VMware vSphere solution and click Configure.
    2. In the Manage Solutions dialog box, select vCenter Adapter - sfo01w01vc01, click Test Connection, accept the new certificate of vCenter Server, and click Save Settings.
  7. Reconnect the VMware vSAN adapter for the management cluster.
    1. In the left pane of vRealize Operations Manager, click Solutions.
    2. Select the VMware vSAN solution and click Configure.
    3. In the Manage Solutions dialog box, select vSAN Adapter - sfo01w01vc01, click Test Connection, accept the new certificate of the Management vCenter Server, and click Save Settings.