Upgrade the nodes in your VMware Identity Manager cluster one at a time. Expect some downtime during upgrade and plan the timing of your upgrade accordingly.
When VMware Identity Manager is deployed with vRealize Suite Lifecycle Manager, the best practice is to perform all lifecycle operations, including a VMware Identity Manager upgrade, using vRealize Suite Lifecycle Manager. See the vRealize Suite Lifecycle Installation, Upgrade, and Management Guide, specifically the Upgrade VMware Identity Manager topic.
Offline upgrades without Lifecycle Manager are supported only for single node deployments, not for cluster deployments.
The way load balancing is implemented in your VMware Identity Manager deployment can vary, which affects the procedures you perform.
For general load-balancing information, see the 3.3 version of the Installing and Configuring VMware Identity Manager for Linux guide, such as the Using a Load Balancer or Reverse Proxy to Enable External Access to VMware Identity Manager topic.
For load-balancing information specific to VMware NSX-T™ or VMware NSX® for vSphere®, see the corresponding VMware Validated Design™ documentation that follows for guidance.
- For VMware NSX-T, see topics such as the following.
Type of Information Topic Name and Link VMware NSX-T Design Network Design for Cross-Region Workspace ONE Access VMware NSX-T Deployment Configure the Load Balancer for the Cross-Region Workspace ONE Access Cluster in Region A - For VMware NSX for vSphere, see topics such as the following.
VMware NSX for vSphere Deployment Configure the Load Balancer for the Cross-Region Workspace ONE Access Cluster in Region A