In this example, an IT administrator at a financial data center must plan for an increase in workloads as tax season approaches. To evaluate whether additional workloads can be added to existing virtual infrastructure, the administrator runs a what-if scenario.

Prerequisites

The administrator must have credentials for operating vRealize Operations Manager and managing vCenter Server objects.

Procedure

  1. The administrator clicks Home > Optimize Capacity > What-If Analysis.

    The What-If Analysis screen appears.

  2. Clicks SELECT in the Add Workload pane.

    The Add Workload screen appears.

  3. Enters Workload Tax 2018 in the SCENARIO NAME field, then selects DC-Chicago-16 (vc_10.27.83.19) from the list under LOCATION - WHERE WOULD YOU LIKE TO ADD YOUR WORKLOAD?

    The field to the right populates with the words, Any cluster. The administrator selects Cluster - Mich2long from the list.

  4. The administrator clicks the Configure radio button in the APPLICATION PROFILE field, then clicks ADVANCED CONFIGURATION.

    The Advanced Configuration dialog box appears.

  5. For the CPU row, the administrator enters 4 in the Resource Amount column and increments the counter in the Expected Utilization column to 65%. For the Memory row, enters 18 in the Resource Amount column and increments the counter in the Expected Utilization column to 65%. For the Storage row, enters 65 in the Resource Amount column and increments the counter in the Expected Utilization column to 65%.

    The configuration is nearly complete.

  6. The administrator selects Thin provisioning and clicks SAVE.

    The Add Workload screen appears. The data entered on the previous screen appears in the APPLICATION PROFILE field.

  7. In the DATE area, the administrator selects 3/25/18 and 5/30/18 as the start and end dates, respectively, then clicks RUN SCENARIO.

    The scenario runs and the results appear. To the administrator's surprise, the workload does not fit.

  8. At the top right of the screen, the administrator selects a different cluster: Cluster - Mich3long. Then clicks the RUN SCENARIO button to the right of the list.

    The scenario runs and the results appear. This time the workload fits. It is projected to cost $84/month to run in the VMware hybrid cloud.

Results

The administrator identifies a location in the virtual infrastructure where the required workload can reside and support the coming increase in production requirements.

What to do next

Assuming this plan is the best of the scenarios the administrator has run, it can be implemented in time to support the added workload. The administrator can monitor the workload performance using the Workload Optimization and Capacity Optimization features. For information on Workload Optimization, see the vRealize Operations Manager Configuration Guide.