The workflow runs a full synchronization for a virtual machine with a configured outgoing replication from the local site to the target vCenter Server site.

Prerequisites

Verify that the virtual machine for which you want to run a full synchronization is powered on.

Procedure

  1. Log in to VMware Aria Automation Orchestrator client as an administrator.
  2. Navigate to Library > Workflows.
  3. In the Filter box, enter Full Sync Replication to VC and press Enter.
  4. Click the workflow and click Run.
  5. Select the replication that you want to sync and click Run.