After you create the recovery plan, configure the startup priority, the startup and shutdown options for the virtual machines of the analytics cluster. After failover or planned migration, the primary node of VMware Aria Operations must start first.

For the following procedure, use the VMware Cloud Foundation Planning and Preparation Workbook.

Procedure

  1. Log in to Site Recovery Manager at https://<srm_fqdn/dr> in the protected VMware Cloud Foundation instance as [email protected].
  2. In the site pair pane, click View details.

  3. On the main navigation bar, click Recovery plans.
  4. In the left pane, navigate to the recovery plan and click the Recovery steps tab.

  5. Change the startup priority of the primary node of the VMware Aria Operations analytics cluster.

    1. Expand the Power on priority 3 VMs section.

    2. Right-click the primary node of the VMware Aria Operations and select Priority group > 1 (Highest).

    3. In the Change priority dialog box, click Yes.

  6. Repeat this step to configure the startup priority for the remaining analytics cluster nodes.

    Virtual machine

    Power on Priority Order

    VMware Aria Operations replica node

    2

    VMware Aria Operations data node(s)

    3

  7. Add a user prompt to verify the availability of the load balancer for VMware Aria Operations.

    1. Right-click Power on priority 1 VMs and select Add step before.

    2. In the Add step dialog box, configure the settings and click Add.

      Setting

      Value

      Type

      Prompt

      Name

      Verify the availability of the load balancer for VMware Aria Operations

      Content

      Verify the availability of the load balancer for VMware Aria Operations

  8. Add a user prompt to verify the availability of the clustered Workspace ONE Access.

    1. Right-click Power on priority 1 VMs and select Add step before.

    2. In the Add step dialog box, configure the settings and click Add.

      Setting

      Value

      Type

      Prompt

      Name

      Verify the availability of the clustered Workspace ONE Access

      Content

      Verify the availability of the clustered Workspace ONE Access

  9. Add a user prompt to manually power off all running VMware Aria Operations remote collectors.

    1. Right-click Power on priority 1 VMs and select Add step before.

    2. In the Add step dialog box, configure the settings and click Add.

      Setting

      Value

      Type

      Prompt

      Name

      Manually power off all running remote collectors

      Content

      Manually power off all running remote collectors. In case of planned migration, the collectors will already be powered down.

  10. Add a user prompt to monitor the status of the VMware Aria Operations primary node.

    1. Right-click Power on priority 2 VMs and select Add step before.

    2. In the Add step dialog box, configure the settings and click Add.

      Setting

      Value

      Type

      Prompt

      Name

      Monitor the status of the VMware Aria Operations primary node

      Content

      For planned migration:

      • State is Not Running

      • Status is Offline

      For disaster recovery:

      • State is Running

      • Status is Waiting For Analytics

  11. Add a user prompt to monitor the status of the VMware Aria Operations replica node.

    1. Right-click Power on priority 3 VMs and select Add step before.

    2. In the Add step dialog box, configure the settings and click Add.

      Setting

      Value

      Type

      Prompt

      Name

      Monitor the status of the VMware Aria Operations replica node

      Content

      For planned migration:

      • State is Not Running

      • Status is Offline

      For disaster recovery:

      • State is Running

      • Status is Waiting For Analytics

  12. Add a user prompt to monitor the status of the VMware Aria Operations data node.

    1. Right-click Power on priority 4 VMs and select Add step before.

    2. In the Add step dialog box, configure the settings and click Add.

      Setting

      Value

      Type

      Prompt

      Name

      Monitor the status of the VMware Aria Operations data node

      Content

      For planned migration:

      • State is Not Running

      • Status is Offline

      For disaster recovery:

      • State is Running

      • Status is Online

  13. Add a user prompt to power on the VMware Aria Operations cloud proxies.

    1. Right-click Power on priority 4 VMs and select Add step before.

    2. In the Add step dialog box, configure the settings and click Add.

      Setting

      Value

      Type

      Prompt

      Name

      Power on the VMware Aria Operations cloud proxies

      Content

      Power on all available VMware Aria Operations cloud proxies