After failover of the Cloud Management Platform, vRealize Operations Manager, and vRealize Suite Lifecycle Manager, you must perform additional tasks to ensure that the management applications work as expected.
Procedure
Configure the UDLR Control Virtual Machine to Forward Events to vRealize Log Insight for VMware Cloud Foundation in Region B Configure the UDLR control VM instances for the management cluster to forward log information to vRealize Log Insight in Region B.
Update the DNS Record for vRealize Log Insight for VMware Cloud Foundation in Region A After you fail over the management applications in the SDDC to Region B, to send logs to the vRealize Log Insight instance in Region B, you update the DNS record for vRealize Log Insight in the to point to the Region B instance.
Connect vRealize Operations Manager to vRealize Log Insight for VMware Cloud Foundation in Region B After disaster recovery to Region B, vRealize Operations Manager is still connected to the vRealize Log Insight instance in Region A. Because of the site failure in Region A, the vRealize Log Insight instance in Region A is not accessible. Configure the vRealize Log Insight Adapter to integrate vRealize Operations Manager with vRealize Log Insight in Region B.