You install and configure vRealize Operations for Horizon software components on machines in your vRealize Operations Manager and Horizon environments.
The amount of time required to install and configure vRealize Operations for Horizon depends on the number of desktop pools in your Horizon environment. The installation and configuration process typically takes about an hour, excluding download time.
Prerequisites
Verify that your environment meets product compatibility, hardware, and software requirements. See Preparing for Installation.
Verify that VMware Horizon and vRealize Operations Manager are installed, running, and upgraded to the desired version.
Verify that a vCenter Adapter instance is configured for each vCenter Server instance in your Horizon infrastructure. The vCenter Adapter is provided with vRealize Operations Manager.
Ensure that the vCenter Server configuration in Horizon Administrator is consistent with the configuration on the vCenter Adapter. The vCenter Server must be specified by FQDN in both configurations or by IP address in both configurations.
Synchronize the time on all hosts to an NTP server.
Obtain a license key for the vRealize Operations for Horizon solution.